There was some decent progress made on day 3 - the floor was put down and the framing was done for the new walls. At some point during day 3 it looked like this:
It was starting to look like an actual bathroom again instead of a disaster zone.
But then they put the tarps back down to protect the floor, moved the ladder and other tools back in and by the time I got home from work it looked like this:
*Sad face*
0 comments:
Post a Comment